PROJECTS:
Roof Upgrade
The roof on the original building will be replaced with a new, high-quality roof system that has a 22-30 year life-span, is energy-efficient and environmentally friendly.
New Heating/Cooling System & New Controls
The existing rooftop package units have exceeded their expected service. These will be replaced with new, high-efficiency heating/cooling equipment to improve indoor air quality and building environment. All existing control hardware will be replaced and integrated into the District’s control system to optimize the performance of the new heating/cooling systems.
Reconfigure Classrooms
To better utilize available space and serve the needs of the students, three spaces will be reconfigured and repurposed into additional classrooms.
Parking Lot Repairs
The main parking lots has many large cracks and settling issues that have led to potential trip hazards. To provide a lasting solution to the issues the .parking lot will be repaired and repaved.